Unit 16: Stage E – Opportunities & Solutions

The candidates should demonstrate that they are proficient in:

  • explaining how Transition Architectures are created and documented;
  • explaining the impact of security architecture at this stage.
  • explaining how to define and group work packages;
  • explaining how migration planning methods are utilized within this phase to review and consolidate the gap analysis results from earlier phases;

Unit 5: Architecture Content Framework

The applicants should be conversant with:

  • describing the link between the TOGAF ADM and the Architecture Content Framework.
  • describing the major components of the Content Metamodel;
  • explaining the function of the Architecture Content Framework;

 

NEW QUESTION 43
Scenario: Glacier Ridge LLC
Please read this scenario prior to answering the question
Glacier Ridge LLC is a vacation property management firm that is growing through acquisition. It manages over 200 resort properties across North America. Many of the resort properties use the same internal IT systems that they used before they were acquired. Until recently, the only requirement that has been placed en each property is that they use a standard financial reporting system to report their financials ID the headquarters on a weekly basis. The CEO has stated his concerns about the inefficiencies of the current approach and identified the need to change. He has defined a new strategic vision that will enhance the Glacier Ridge property business by standardizing its operations across the network to provide consolidated financial, human resources, logistics, sales and marketing, and yield management. He has also stated that he expects results by the end of the current fiscal year. These changes will provide the company with improved utilization of its capacity and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics that will enable the marketing group to improve its ability to target advertising into key markets to improve yields. Glacier Ridge has mature enterprise architecture (EA) practice and uses TOGAF 9 as the method and guiding framework.
The CIO is the sponsor of the activity. In planning this change, the Chief Architect engaged the services of a well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify the strategic changes needed to implement the CEO’s vision. This recently completed with approval of a strategic architecture encompassing the entire firm, including detailed requirements and recommendations.
Based on the recommendations from the initial engagement, Glacier Ridge has embraced an Architecture Vision to adopt an enterprise application that is tailored to the needs of the hospitality industry.
Refer to the Glacier Ridge scenario
Your role is that of Chief Architect. You have been asked to recommend the best approach to take in this architecture engagement to realize the CEO’s vision. Based on TOGAF 9, which of the following is the best answer?

 
 
 
 

NEW QUESTION 44
Scenario: AutoComp Corporation
AutoComp Corporation produces components for the Car industry. Driven by the global financial downturn they are looking to reduce IT costs. They believe there is a cost saving opportunity within IT but this is not quantified in terms of potential savings nor is there agreed target architecture.
Final decisions on the solutions are not yet fully agreed. They have completed their Vision Phase and first pass of the three architecture definition phases and now they want to finalize and plan their solutions. You are the Chief Architect from a consulting organization brought into review the work to date by AutoComp Corporation and to make recommendations to the CIO and the board on this.
Which of the following answers best describes how TOGAF recommends in this context?

 
 
 
 

NEW QUESTION 45
Scenario: Armstrong Defense Industries
Please read this scenario prior to answering the question
Armstrong Defense Industries is the prime contractor for the Dreadnought Unmanned Aircraft System program.
Over the course of this contract, the company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. Armstrong Defense is moving aggressively to consolidate and reduce redundant procurement processes and systems. The CEO has announced that the company will seek to leverage higher volume discounts and lower related IT support costs by instituting a preferred supplier program.
To achieve this goal, Armstrong Defense needs to define Baseline and Target Architectures. These architectures must address key stakeholders concerns such as:
1. What groups of people should be involved in procurement-related business processes?
2. What current applications do those groups use?
3. Which procurement-related business processes are supported by zero, one, or many existing applications?
4. What are the overall lifetimes of the Request for Proposal and Purchase Order business objects?
5. What non-procurement applications will need to be integrated with any new procurement applications?
6. What data will need to be shared?
At present, there are no particularly useful architectural assets related to this initiative. All assets need to be acquired and customized or created from scratch. The company prefers to implement existing package applications from systems vendors with little customization.
The architecture development project has just completed its Architecture Context iteration cycle and is about to begin the Architecture Definition iteration cycle.
Armstrong Defense is using TOGAF for its internal Enterprise Architecture activities. It uses an iterative approach for executing Architecture Development Method (ADM) projects.
Refer to the Armstrong Defense Industries Scenario
You are serving as the Lead Architect.
You have been asked to identify the most appropriate architecture viewpoints for this situation.
Based on TOGAF 9, which of the following is the best answer?

 
 
 
 

NEW QUESTION 46

 
 
 
 
 

NEW QUESTION 47
Scenario: Global Mobile 1
Please read this scenario prior to answering the question
Global Mobile is a mobile telecommunications company formed through a series of mergers and acquisitions. They are yet to fully integrate the customer service systems for the most recent acquisitions, and as result, customer service has been a major concern for the Chief Technology Officer.
Results for the last two quarters have shown that Average Revenue Per User (ARPU) and the customer retention (Churn) rate have fallen below the industry average. The Corporate Marketing group has published some new findings about customer satisfaction. The customers appear to be switching to Air Light, a competitor, because of superior customer service. Global Mobile actually has better coverage in nearly all markets than Air Light, and good roaming agreements that keep rates low for business travelers. But, customer satisfaction has remained low.
The Business Strategy group and the Enterprise Architecture group have conducted a high-level project to develop the enterprise-wide strategic plan. They have developed a business scenario which contains a good conceptual model of what needs to be done, and also identifies the key requirements. This was used in preparing the proposal presented to the Executive Council and the Corporate Board.
The planning for the program has been underway for several months. Global Mobile has selected TOGAF 9 as the basis for its Enterprise Architecture.
The Corporate Board has approved funding for a multi-million Euro conversion to transition to a packaged Customer Service System. It is anticipated that the overall program will take five years to complete, but there are some tactical projects that can commence immediately to address the situation. The Corporate Board has placed one additional major constraint on the program. In addition to achieving the business outcomes directly related to improving overall customer service within each business unit, the Corporate Board expects the Target Architecture to produce an additional saving of at least 30% over current operating costs through energy efficiency initiatives, virtualization of servers and workstations, and expanded telecommuting and desk-sharing. This Green initiative is intended to become a model for future investments at all company facilities worldwide.
Refer to Global Mobile scenario
You have been engaged as a consultant to advise the Chief Architect on the best ways to approach to the implementation planning activities for this significant business transformation.
Based on TOGAF 9, which of the following is the best answer? (Is this the right answers to choose?)

 
 
 
 

NEW QUESTION 48
Scenario: Glacier Ridge LLC
Please read this scenario prior to answering the question
Glacier Ridge LLC is a vacation property management firm that is growing through acquisition. It manages over
200 resort properties across North America. Many of the resort properties use the same internal IT systems
that they used before they were acquired. Until recently, the only requirement that has been placed en each
property is that they use a standard financial reporting system to report their financials ID the headquarters on
a weekly basis. The CEO has stated his concerns about the inefficiencies of the current approach and
identified the need to change. He has defined a new strategic vision that will enhance the Glacier Ridge
property business by standardizing its operations across the network to provide consolidated financial, human
resources, logistics, sales and marketing, and yield management. He has also stated that he expects results by
the end of the current fiscal year. These changes will provide the company with improved utilization of its
capacity and more efficient operations. The addition of a corporate-wide data warehouse will provide analytics
that will enable the marketing group to improve its ability to target advertising into key markets to improve
yields. Glacier Ridge has mature enterprise architecture (EA) practice and uses TOGAF 9 as the method and
guiding framework.
The CIO is the sponsor of the activity. In planning this change, the Chief Architect engaged the services of a
well-known consulting firm that specializes in business strategy. An initial study has been conducted to identify
the strategic changes needed to implement the CEO’s vision. This recently completed with approval of a
strategic architecture encompassing the entire firm, including detailed requirements and recommendations.
Based on the recommendations from the initial engagement, Glacier Ridge has embraced an Architecture
Vision to adopt an enterprise application that is tailored to the needs of the hospitality industry.
Refer to the Glacier Ridge scenario
Your role is that of Chief Architect. You have been asked to recommend the best approach to take in this
architecture engagement to realize the CEO’s vision. Based on TOGAF 9, which of the following is the best
answer?

 
 
 
 

NEW QUESTION 49
Scenario: Sollace Manufacturing
Please read this scenario prior to answering the question
Sollace Manufacturing is a major supplier in the automotive industry, headquartered In Cleveland, Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.
Sollace Manufacturing is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff. The Sollace Manufacturing Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9. At a recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation. The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their planning and production scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns can be addressed.
Refer to the Sollace Manufacturing Scenario
You are serving as the Lead Enterprise Architect for the Common ERP Deployment architecture project. One of the earliest initiatives in the Enterprise Architecture program at Sollace Manufacturing was the definition of a set of IT principles and architecture principles that are well aligned with the overall enterprise principles. These now need to be updated to address the concerns raised.
You have been asked to select a set of principles most appropriate for guiding the team to define a robust solution. [Note: You should assume that Sollace Manufacturing has adopted the example set of principles that are listed and defined in TOGAF 9, Section 23.6.] Based on TOGAF 9, which of the following is the best answer?

 
 
 
 

NEW QUESTION 50
Patterns & Co. is introducing a Commercial Off-the-Shelf (COTS) Market Analytics solution in order to improve its new delivery service.
Patterns & Co. has a mature enterprise architecture capability and the CIO is the sponsor of the enterprise architecture team. The business vision and requirements for the new system are defined. It includes a detailed business process analysis. The supplier has proposed a solution but the Architecture Board identified some of the project requirements not consistent with the adopted infrastructure standards. The CIO considered the risks and approved the implementation.
The CIO has asked the EA team to execute the Phase G ensuring that the system performance KPIs are respected, the project remains within budget and security guidelines are met.
Refer to the scenario above
As Lead Enterprise Architect you have to recommend a plan to implement the CIO decision. Choose the best answer according to TOGAF 9.
Choose one of the following answers

 
 
 
 

NEW QUESTION 51
Scenario: Raxlon Inc.
Case Study Title (Case Study):
Raxlon Inc. is a Fortune 500 Company dealing in high value drugs and pharma products. Its annual turnover is over 120 billion $. It has more than 100,000 employees all over the globe in its R&D, Manufacturing and Marketing Units.
Raxlon’s CEO, Dr Peter Fowles, is a pharmacology expert and has over 72 patents on various types of drugs mainly used for treating patients with genetic disorders. Raxlon is now moving into a suite of high end critical drug products used for Genetic Repair of congenital Diseases like Alzhmeir’s disease and Epilepsy. Rexlon has a well developed EA practice and in 2009 the EA practice has adopted TOGAF 9 as the primary Framework for Enterprise Architectural Change Agent.
Dr Fowles’ main concerns are:
Security of the critical data which they have gained over the years after painstaking research. Although Rexlon had an adequate security system Dr Fowles feels it may not be adequate to deal with the new order of things, especially with data which is highly confidential and if leaked would have major financial impact on the Company.
Dr Fowles calls his CIO and explains his position to him and entrusts whim with the responsibly of evaluating the current security system, operation and governance and determine which are the gaps which need to be addressed during the fresh architectural work. Assume that a new Security Framework would be used in the ADM life cycle. To protect Rexlon’s valuable IP.
The CIO apprises the Lead Architect of the sensitive nature of the work he has to complete within the next 2 months.
Identify which of the following processes would be most appropriate for the Lead Architect to adopt in this situation.

 
 
 
 

NEW QUESTION 52

 
 
 
 
 

NEW QUESTION 53
Scenario: AutoComp Corporation
AutoComp Corporation produces components for the Car industry. Driven by the global financial downturn they
are looking to reduce IT costs. They believe there is a cost saving opportunity within IT but this is not quantified
in terms of potential savings nor is there agreed target architecture.
Final decisions on the solutions are not yet fully agreed. They have completed their Vision Phase and first pass
of the three architecture definition phases and now they want to finalize and plan their solutions. You are the
Chief Architect from a consulting organization brought into review the work to date by AutoComp Corporation
and to make recommendations to the CIO and the board on this.
Which of the following answers best describes how TOGAF recommends in this context?

 
 
 
 

NEW QUESTION 54
Scenario
Please read this scenario prior to answering the question
You have been appointed as a consultant to the Chief Enterprise Architect of a multinational pharmaceutical corporation. The corporation includes 30 subsidiary companies with operations in over 60 countries and products sold in over 125 countries. It has major research and development sites in over 45 locations worldwide.
The management team is deeply committed to ensuring that the corporation is a world leader in socially responsible pharmaceutical development with a business strategy that focuses on profitability through environmentally friendly operating processes as well as a commitment to disease eradication.
The operations of the corporation are subject to legal and regulatory requirements for each country where they operate. The production of prescription pharmaceutical products has governmental controls that are strictly enforced and compliance is critical. Recently a competitor was heavily fined for violating the regulations in a country where it was conducting a clinical trial for a new regulated drug.
The Governing Board is concerned about the risks posed in this complex global environment. As a result the Chief Executive Officer (CEO) has appointed a Chief Compliance Officer (CCO) to be responsible for overseeing and managing compliance issues for the corporation. The CCO reports directly to the CEO.
The CCO has approved the expenditure of resources to establish an Enterprise Architecture program. He has requested to be informed about the status of projects that could impact regulatory compliance. He also wants the corporate legal staff and auditors to analyze all proposed architectures to ensure that they are within the legal guidelines for each country. In addition, the research organization should be able to see that the architecture is appropriate for its needs.
TOGAF 9 has been mandated as the framework for the development and evolution of the Enterprise Architecture practice. The Preliminary Phase has been completed to establish the enterprise architecture capability for this project.
Refer to the Scenario
You have been asked to recommend an approach that would enable the development of an architecture that addresses the needs of the Chief Compliance Officer, legal staff, auditors and the research organization.
Based on TOGAF, which of the following is the best answer?

 
 
 
 

NEW QUESTION 55
Scenario: AGEX Inc.
Please read this scenario prior to answering the question
AGEX is a large, global commodities trading company which has been growing rapidly through a series of acquisitions.
Each new business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information.
The inability to share information across businesses has resulted in lost opportunities to “leverage the synergies” that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.
As a result, AGEX has begun implementing a single Enterprise Resource Planning (ERP) system to consolidate information from several applications that exist across the lines of business. The Corporate Board is concerned that the new ERP system must be able to manage and safeguard customer information in a manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services offered to clients and trading partners.
The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the ERP implementation team and the business unit personnel who will be involved in the migration process. The CIO has also formed a cross-functional Architecture Review Board to oversee and govern the architecture.
After reviewing the available alternatives, and based on recommendations from the ERP vendor, AGEX has selected TOGAF 9 as the basis for its Enterprise Architecture program.
The CIO has endorsed this choice with the full support of top management.
Refer to the AGEX Inc. Scenario
You are serving as the Chief Architect.
You have been asked to recommend the approach to take in the Preliminary Phase to ensure that the Corporate Board’s concern is addressed.
Based on TOGAF 9, which of the following is the best answer?

 
 
 
 

NEW QUESTION 56
Scenario: AGEX Inc.
Please read this scenario prior to answering the question
AGEX is a large, global commodities trading company which has been growing rapidly through a series of acquisitions.
Each new business is performing well in its markets. However, the lack of integration between headquarters and the business units has increasingly caused problems in the handling of customer and financial information. The inability to share information across businesses has resulted in lost opportunities to “leverage the synergies” that had been intended when the businesses were acquired. At present, each business unit maintains its own applications. Despite an earlier initiative to install a common application to manage customer, products, supplier, and inventory information, each business unit has different ways of defining each of these core elements and has customized the common application to the point where the ability to exchange information is difficult, costly, and error-prone.
As a result, AGEX has begun implementing a single Enterprise Resource Planning (ERP) system to consolidate information from several applications that exist across the lines of business. The Corporate Board is concerned that the new ERP system must be able to manage and safeguard customer information in a manner that meets or exceeds the legal requirements of the countries in which the company operates. This will be an increasingly important capability as the company expands its online services offered to clients and trading partners.
The CIO has formed an Enterprise Architecture department, and one of the primary goals in its charter is to coordinate efforts between the ERP implementation team and the business unit personnel who will be involved in the migration process. The CIO has also formed a cross-functional Architecture Review Board to oversee and govern the architecture.
After reviewing the available alternatives, and based on recommendations from the ERP vendor, AGEX has selected TOGAF 9 as the basis for its Enterprise Architecture program.
The CIO has endorsed this choice with the full support of top management.
Refer to the AGEX Inc. Scenario
You are serving as the Chief Architect.
You have been asked to recommend the approach to take in the Preliminary Phase to ensure that the Corporate Board’s concern is addressed.
Based en TOGAF 9, which of the following is the best answer?

 
 
 
 

NEW QUESTION 57
ARTI Dimensioning is a multinational that operates production facilities in 29 countries and sells its products in over 120 countries.
A consultancy firm has recommended a realignment that will enhance sharing of product information across business units. The implementation of this strategic realignment will require the development of integrated customer information systems and product information systems.
ARTI has a mature enterprise architecture practice and uses TOGAF 9 for the basis of the ARTI Architecture Framework (method and deliverables). The CIO is sponsoring an architecture development program that is going to start. The CIO is concerned about a potential disruptive result to the business of this activity and before proceeding with the architecture development he asked to evaluate the impacts on the company business.
Refer to the scenario above
You are the Lead Architect and you have been asked to recommend an approach to address the concerns raised. Based on TOGAF 9 recommend which of the following is the best answer.
Choose one of the following answers.

 
 
 
 

NEW QUESTION 58
UTrack Transports is a strong UK logistics company. The head of the strategic marketing division engaged the Principal Architect issuing a Request for architectural work to design an enhancement of the current Enterprise Data Warehouse system. An enhancement is needed to support the change in the business model; UTrack wants to leverage on customer data collected during business as usual activities and anonymize them to offer marketing agencies a fresh and accessible source of analytics data, this will increase the company revenues.
TOGAF 9 is the architectural framework in use.
Refer to the scenario above The Principal Architect has decided to ask you as Business Intelligence Subject Matter Expert to design the Data Architecture. The Chief Architect shared with you the Architecture Definition Document including the Business Architecture design. You now need to choose the artifacts you want to produce as part of the Data Architecture design. Identify the best answer accordingly to the TOGAF 9.
Choose one of the following answers

 
 
 
 

NEW QUESTION 59
Scenario:
Please read this scenario prior to answering the Question
You are serving as the Lead Architect for the enterprise architecture team at a large multinational company. The company has grown rapidly by acquisition and has inherited numerous different procurement processes and related IT systems. At present, the current procurement processes have been distributed across autonomous business units, and are not well understood.
Several procurement processes have had problems related to the timing of purchases, which has led to excess inventory. As a result of this, the Vice President in charge of Supply Chain Management has made the decision to consolidate and reduce redundant procurement processes and systems.
TOGAF 9 Is used for internal Enterprise Architecture activities. This project is using an iterative approach for executing Architecture Development Method (ADM). The CIO is the project sponsor and has approved the Request for Architecture Work. After an initial Architecture Capability iteration, the architecture development project has completed Phase A, and has started a number of Architecture Development iteration cycles. The first iteration will include the Business, Application, and Data Architectures. Key stakeholder concerns that should be addressed by these architectures include:
1. What groups of people are involved in the supply chain management-related business processes?
2. What non-supply chain management applications are integrated with the supply chain management applications?
3. What data is shared?
Refer to the Scenario
[Note: You may need to refer to Chapter 35 of the reference text in order to answer this question.] You have been asked to identify the most appropriate catalogs, matrices, and diagrams to support the Architecture development.
Based on TOGAF 9, which of the following is the best answer?

 
 
 
 

NEW QUESTION 60
Please read this scenario prior to answering the question
You are serving as the Lead Architect for a chain of convenience stores, operating as a franchise, which has over 5000 retail outlets throughout the Asia-Pacific region. The stores operate 24 hours a day and 7 days a week and rely on point-of-sale technology to manage their inventory.
Stores place all orders on-line. The back-office systems collect real-time data to support ordering and product selection decisions including the tailoring of product assortment based on sales history, customer demographics as well as the next day’s weather forecast. In many cases, several stores are located in neighboring areas. This strategy makes distribution to each store cheaper, as well as making multiple deliveries per day possible.
An Enterprise Architecture practice exists within the company, with the CEO and CIO as joint sponsors.
They have decided to adopt TOGAF 9 within the practice and the first project is to restructure the Enterprise Architecture so that it can better accommodate the changing strategies within the company and also better respond to changes in economic and technical environments.
The CIO has stated that the following issues need to be addressed in the restructuring:
The systems should be able to withstand any unforeseen disruptions which might affect day to day

operations. This is highly critical for ensuring high levels of customer satisfaction and maintaining and growing revenue.
Dependencies between the application components, the application platform, and technology

infrastructure should be minimal and well defined. This will facilitate scalability and ease of enhancement of the service offerings.
The company is adopting the ARTS Operational Data Model and Data Warehouse Model from the

National Retail Federation. This will address past problems with data quality and inconsistent data.
To remain competitive, new products and promotions must undergo market trials and if these are

successful, deployed across the retail chain. Information systems must be able to manage changes and updates without undue delays.
Refer to the Scenario
[Note: You should assume that the company has adopted the example set of principles that are listed and defined in TOGAF, Section 23.6. You may need to refer to Chapter 23 of the reference text in order to answer this question.] You have been asked to identify the most relevant architecture principles for the current situation.
Based on TOGAF, which of the following is the best answer? [Note: The ordering of the principles listed in each answer is not significant.]

 
 
 
 

NEW QUESTION 61
Scenario: Marona Inc.
Marona Inc is a Fortune 500 Enterprise in the retail industry with retail store components manufacturing units
and marketing outlets spanning the globe and having an annual turnover of 20 billion$ with more than 100, 000
employees world wide.
The CEO, CIO and the stakeholders of the ongoing EA projects are concerned about rising costs and as one
measure want to do an investigation into the operational aspects of the realized Enterprise Architecture using
TOGAF9.
The CIO approaches you as the Lead Enterprise Architect to carry out this exercise the stakeholder had voiced
to him the following concerns:
They want to analyze the roles of the top management for each revenue earning service. Moreover, many of
the HR related critical Search application component have become extremely slow. This needs to be
diagnosed and rectified. Moreover there is no proper tracking of revenue from retail store component products
over time. There has also been a lot of unauthorized or unwanted access to many of the critical information.
Hence the mode of access needs to be strengthened and made much more secure. Another additional
concern is the new launches and the progress of each of the launches over time.
Determine which of the following set of viewpoints are most appropriate to analyze and view in order to address
this concern of the stakeholders.

 
 
 
 

NEW QUESTION 62
Scenario: Sollace Manufacturing
Please read this scenario prior to answering the question
Sollace Manufacturing is a major supplier in the automotive industry, headquartered In Cleveland, Ohio with manufacturing plants in Chicago, Sao Paulo, Stuttgart, Yokohama, and Seoul. Each of these plants has been operating its own planning and production scheduling systems, as well as custom developed applications that drive the automated production equipment at each plant.
Sollace Manufacturing is implementing lean manufacturing principles to minimize waste and improve the efficiency of all of its production operations. During a recent exercise held for internal quality improvement, it was determined that a significant reduction in process waste could be achieved by replacing the current planning and scheduling systems with a common Enterprise Resource Planning (ERP) system located in the Cleveland data center. This central system would provide support to each of the plants replacing the functionality in the existing systems. It would also eliminate the need for full data centers at each of the plant facilities. A reduced number of IT staff could support the remaining applications. In some cases, a third-party contractor could provide those staff. The Sollace Manufacturing Enterprise Architecture department has been operating for several years and has mature, well-developed architecture governance and development processes that are strongly based on TOGAF 9. At a recent meeting, the Architecture Review Board approved a Request for Architecture Work from the Chief Engineer of Global Manufacturing Operations who is the project sponsor. The request covered the initial architectural investigations and the development of a comprehensive architecture to plan the transformation. The Common ERP Deployment architecture project team has now been formed, and the project team has been asked to develop an Architecture Vision that will achieve the desired outcomes and benefits. Some of the plant managers have expressed concern about the security and reliability of driving their planning and production scheduling from a central system located in Cleveland. The Chief Engineer wants to know how these concerns can be addressed.
Refer to the Sollace Manufacturing Scenario
You are serving as the Lead Enterprise Architect for the Common ERP Deployment architecture project. One of the earliest initiatives in the Enterprise Architecture program at Sollace Manufacturing was the definition of a set of IT principles and architecture principles that are well aligned with the overall enterprise principles.
These now need to be updated to address the concerns raised.
You have been asked to select a set of principles most appropriate for guiding the team to define a robust solution. [Note: You should assume that Sollace Manufacturing has adopted the example set of principles that are listed and defined in TOGAF 9, Section 23.6.] Based on TOGAF 9, which of the following is the best answer?

 
 
 
 

NEW QUESTION 63
FreshFruit Int. is an online American grocer. The Executive Board decided to implement a new strategy to expand the business to other markets.
The CIO is sponsoring an enterprise activity to support the expanded operations.
A new solution is rolled-out to replace the legacy online sales platform. A compliance review was performed to assess the solution implementation.
The result of the review highlighted a complaint from the development team stating that the new system is difficult to integrate with the existing warehouse automation systems. The Chief Architect is concerned that the complaint is not related to a real problem of the solution but is based on personal preferences of the development teams. Another interview with the project team is scheduled.
Refer to the scenario above You are the Lead Architect and an architect from your team leads the review team. You have to answer how, based on TOGAF 9, you should enable the review team to conduct the reviews successfully.
Choose one of the following answers

 
 
 
 

NEW QUESTION 64
Patterns & Co. is introducing a Commercial Off-the-Shelf (COTS) Market Analytics solution in order to improve its new delivery service.
Patterns & Co. has a mature enterprise architecture capability and the CIO is the sponsor of the enterprise architecture team. The business vision and requirements for the new system are defined. It includes a detailed business process analysis. The supplier has proposed a solution but the Architecture Board identified some of the project requirements not consistent with the adopted infrastructure standards. The CIO considered the risks and approved the implementation.
The CIO has asked the EA team to execute the Phase G ensuring that the system performance KPIs are respected, the project remains within budget and security guidelines are met.
Refer to the scenario above As Lead Enterprise Architect you have to recommend a plan to implement the CIO decision. Choose the best answer according to TOGAF 9.
Choose one of the following answers

 
 
 
 

NEW QUESTION 65
TotalComms is a telecommunications company formed from the merging of other 2 telecommunication companies. The business operating model has been unified, the TOGAF 9 Architecture Board approved the outline Implementation and Migration Plan the detailed migration planning must know be approved. Your help is needed to work on the migration planning with all the key stakeholders to achieve an agreement.
Refer to the scenario above
You are the Lead Architect asked to describe accordingly to TOGAF 9 the best way to address the following activities:
The way the migration planning is conducted.
What is going to be implemented.
The stakeholders involved in the implementation.
The definition of the deliverables to use
Choose one of the following answers

 
 
 
 

NEW QUESTION 66
Patterns & Co. is introducing a Commercial Off-the-Shelf (COTS) Market Analytics solution in order to improve its new delivery service.
Patterns & Co. has a mature enterprise architecture capability and the CIO is the sponsor of the enterprise architecture team. The business vision and requirements for the new system are defined. It includes a detailed business process analysis. The supplier has proposed a solution but the Architecture Board identified some of the project requirements not consistent with the adopted infrastructure standards. The CIO considered the risks and approved the implementation.
The CIO has asked the EA team to execute the Phase G ensuring that the system performance KPIs are respected, the project remains within budget and security guidelines are met.
Refer to the scenario above As Lead Enterprise Architect you have to recommend a plan to implement the CIO decision. Choose the best answer according to TOGAF 9.
Choose one of the following answers

 
 
 
 

NEW QUESTION 67
Scenario
Please read this scenario prior to answering the question
You are serving as the Lead Architect for the Enterprise Architecture team at a multinational company. The company has grown rapidly by acquisition and has inherited numerous supply chain processes and related IT systems. Several supply chain processes have had problems related to the timing of purchases, which has led to excess inventory. The Vice President in charge of Supply Chain Management has made the decision to consolidate and reduce redundant processes and systems. The company will move to a “Just- in-time” supply chain management so as to keep inventory costs low.
The TOGAF standard is followed for internal Enterprise Architecture activities. This project is using an iterative approach for executing the Architecture Development Method (ADM).
At present, there are no architectural assets in the Architecture Repository related to this initiative. All assets will need to be acquired, customized, or created. The company prefers to implement commercial off the shelf package applications with little customization. The CIO, who is the project sponsor, has stated that she is not concerned about preserving the existing supply chain management processes or systems.
The architecture development project has completed Phase A and has started a number of iteration cycles to develop the Architecture. As a packaged application is being considered, the next iteration will include both the Business and Application Architectures. Key stakeholder concerns that should be addressed by these architectures include:
1. What groups of people should be involved in the supply chain management-related business processes?
2. What non-supply chain management applications will need to be integrated with any new supply chain management applications?
3. What data will need to be shared?
Refer to the Scenario
[Note: You may need to refer to the Architectural Artifacts chapter, section 31.6 (located in Part IV) of the reference text in order to answer this question.] You have been asked to identify the most appropriate catalogs matrices and diagrams to support the next iteration of Architecture development.
Based on the TOGAF standard, which of the following is the best answer?

 
 
 
 


Who Should Take Open Group OG0-092 Exam?

The Open Group Architecture Framework (TOGAF) is a method mostly used by firms in planning and designing their IT architecture. TOGAF specialists communicate with the heads of different departments, brainstorm, and work together to come up with an IT strategy that is both efficient and beneficial to the company. The audience for this exam is formed by individuals who want to know how to use the TOGAF 9 framework. Also, it is addressed to specialists who work in organizations that are already using TOGAF 9 features and want to learn how to participate in related initiatives and architectures. Besides, architects who want to take over responsibilities related to architecture artifacts are also welcome to take this exam. Another category is formed by architects who want to introduce TOGAF 9 architecture in the enterprise they are working for.

 

Actual Questions Answers Pass With Real OG0-092 Exam Dumps: https://www.actualtests4sure.com/OG0-092-test-questions.html

Post date: 2022-11-22 13:49:27
Post date GMT: 2022-11-22 13:49:27
Post modified date: 2022-11-22 13:49:27
Post modified date GMT: 2022-11-22 13:49:27