This page was exported from Actual Test Materials [ http://blog.actualtests4sure.com ]
Export date: Fri Nov 15 20:16:09 2024 / +0000 GMT

C-TS422-2021 Exam Info and Free Practice Test All-in-One Exam Guide Dec-2022 [Q30-Q51]




C-TS422-2021 Exam Info and Free Practice Test All-in-One Exam Guide Dec-2022

Pass SAP C-TS422-2021 Actual Free Exam Q&As Updated Dump Dec 29, 2022


SAP C-TS422-2021 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Characterize process order elements and process order processing
  • Outline the basics and master data of advanced planning
Topic 2
  • Determine BOM item category, describe order status management and set user statuses
  • Material Requirements Planning in SAP S
  • 4HANA
Topic 3
  • Identify repetitive manufacturing specific master data
  • Identify features for Good Manufacturing Practices (GMP)
Topic 4
  • Identify and explain production relevant master data
  • Configure availability check for components
Topic 5
  • Determine master data objects for process orders
  • Introduction to SAP S
  • 4HANA Supply Chain Planning
Topic 6
  • Explain and compare the different production methods in make-to-order
  • Outline production planning components and functions
Topic 7
  • Outline both motivation and background of SAP S
  • 4HANA
  • Select and apply planning strategies, use the planning table

 

Q30. Which options do you have to plan both quant ties and capacities during line loading in repetitive manufacturing?

 
 
 
 

Q31. What is a work center hierarchy in planning in SAP S/4HANA?

 
 
 
 

Q32. Your project used process orders for the production of liquid chemicals.
What can you define to ensure that the production flow happens only in physically connected tanks?

 
 
 
 

Q33. Which materials have a negative quantity in a bill of materials or in a recipe?

 
 
 
 
 

Q34. What type of time element can be reduced by strategy settings while dispatching?

 
 
 
 

Q35. Which item statuses can you select inside a material BOM?

 
 
 
 

Q36. During production order creation, several valid production versions are found. How does the system choose the production version?

 
 
 
 

Q37. What do you use to dispatch operations from planned orders so that the production plan can be fulfilled?

 
 
 
 

Q38. What does a line hierarchy in repetitive manufacturing represent?

 
 
 
 

Q39. Where do you maintain data to determine the duration of an operation for production?

 
 
 
 

Q40. Which SAP application can be used for forcasting in Supply Chain Planning?

 
 
 
 

Q41. Which business processes are affected by setting in the order type-dependent parameters?

 
 
 
 

Q42. You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

 
 
 
 

Q43. Which times elements does MRP consider in backward scheduling to determine he order dates for components from dependent requirements?

 
 
 
 

Q44. Which alternative item strategies are available in bills of materials (BOM) in SAP S/4HANA?

 
 
 
 

Q45. In your project, you have several materials that are planned by different people. How can you assign the planning responsibility?

 
 
 
 

Q46. An issue storage location was NOT found through the work center, bill of material(BOM) item, or material master. What determines whether the storage location can be derived from the production version?

 
 
 
 

Q47. What does the material type influence?

 
 
 
 

Q48. You want to insert an operatio at a certain time on work center. The planning direction is forward. The disired dispatching time concides with an operation that has previously been dispatched. How does the insertion take place?

 
 
 
 

Q49. What are the possible results of a production planning run in Advanced Planning (PP/DS)?

 
 
 
 
 

Q50. How can you carry out cost object controlling for production orders?

 
 
 
 

Q51. Your production planners must execute planning only for specific resources. How can you achive this in advanced Planning(PP/DS)

 
 
 
 

Online Questions - Valid Practice C-TS422-2021 Exam Dumps Test Questions: https://www.actualtests4sure.com/C-TS422-2021-test-questions.html

Post date: 2022-12-29 11:38:41
Post date GMT: 2022-12-29 11:38:41
Post modified date: 2022-12-29 11:38:41
Post modified date GMT: 2022-12-29 11:38:41