Rate this post

Try Free and Start Using Realistic Verified 1z0-1075-22 Dumps Instantly

1z0-1075-22 Actual Questions – Instant Download 69 Questions

Oracle 1z0-1075-22 Exam Syllabus Topics:

Topic Details
Topic 1
  • Explain Cost Reporting, including WIP Inventory Valuation Report
  • Set up Plant Parameters and Security, Profile Options, Lookups and DFFs
Topic 2
  • Describe Manufacturing Supervisor Mobile Applications
  • Describe Import Production Transactions
Topic 3
  • Describe Production Execution transactions (including Outside Processing)
  • Set up common Configuration Elements
Topic 4
  • Describe Managerial Accounting Basics & Cost Accounting
  • Describe how work definition is automatically generated
Topic 5
  • Execute Basic Transaction and Work Order Reporting
  • Explain Work Execution Work Areas
Topic 6
  • Evaluate a Work Order completion cost, including Partial and Scrap
  • Explain Work Order Reservations and History
Topic 7
  • Transfer Production Transactions to Costing
  • Manage Production Calendars and add Shift and Work Center Resource exceptions
Topic 8
  • Explain Common Projects Enabled SCM Configurations
  • Describe Functional Set Up Manager and Simplified Setup
Topic 9
  • Explain Production Transaction Review and Product Genealogy
  • Configure Resources, Operations, and Work Centers

 

Q36. You arereviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order statuswhich is reserved against a particular customer.
The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?

 
 
 
 

Q37. Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without creating a new version.

 
 
 
 
 

Q38. In a Manufacturing Cloud post productionsupport environment, a user wants to update some of the operations in the work orders by using the Midpoint Scheduling feature. However, the user is unable to update any of the orders.
Identify two reasons.

 
 
 
 

Q39. The production user wants to report Work Order completion.
Identify two ways of reporting the progress of work order at work order operation level.

 
 
 
 
 

Q40. An employee is responsible for dealing with different manufacturing practices and processes, machines, tools and equipment that turn raw material into a product.
Which seeded job role must this employee be provided with?

 
 
 
 
 

Q41. The Cost Accountant has reported to the Production Supervisor that the Work Order transactions are not getting transferred to Costing.
Identify the reason for work order transactions not getting transferred to Costing.

 
 
 
 

Q42. A Production operator in your company is required to report production activities, suchas completing or scrapping production units, by referencing a work definition without creating work orders.
Identify the manufacturing transaction that a production operator can perform for reporting such activities.

 
 
 
 
 

Q43. A customer has a distribution warehouse (DW) for After Sales and Service and an in-house manufacturing plant (MP). Sales orders are created and shipped from DW.
Identify the two Sourcing Rules that need to be set for order promising to schedule the order.

 
 
 
 

Q44. Identify the three sources from which supply chain orchestration (SCO) can create the work orders.

 
 
 
 
 

Q45. One of the key execution capabilities that Oracle Manufacturing Cloud offers is thatyou can generate and manage work order exceptions.
Which option shows the production exception types that can be reported by the production operator?

 
 
 
 
 

Q46. Identify thetwo capabilities that the Application Development Framework Desktop Integration (ADFDI) framework provides for Work Definitions in Manufacturing Cloud.

 
 
 
 

Q47. As a production supervisor, you require immediate access to critical shop floor execution systems to take actionwhile on the go.
Which four work order related actions can be taken in the Manufacturing Supervisor mobile application?

 
 
 
 
 
 

Q48. You are setting up Fusion Manufacturing to support Back-to-BackFulfillment.
Identify an option that needs to be set for oracle Fusion Planning Central to plan back-to-back item components and resources.

 
 
 
 

Q49. During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.

 
 
 
 

Q50. A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged.
Identify the four transactions to correct this situation.

 
 
 
 
 
 

Q51. The Manufacturing Engineer, responsible for creating and maintaining the Work Definitions, hasscheduled the Process Item Structure Changes to Work Definitions program. However, after the execution of the program the engineer did not receive a notification with the details of the Item Structure changes.
Which two reasons could cause this?

 
 
 
 
 

Q52. Identify two conditions that should be met at the same time for a Standard Operation to be called an Optional Operation.

 
 
 
 
 

Q53. You are in the process of defining a Standard Operation for visual inspection. You want the completion of this standard operation to be reported in all work orders that reference it.
Identify the setup that will fulfill this requirement.

 
 
 
 

Q54. A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance thatneeded to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for thatweek.

 
 
 
 

Q55. In a manufacturing plant, two purchase components P1 and P2 and a resource R1 are required to assemble a product. The cost of the assembly is calculated by using thestandard costing method. The work definition and resource rates of the assembly have been defined as required.
A cost accountant is estimating cost of the assembly, analyzing rolled-up costs before finally publishing estimates as frozen standards to cost accounting by using a cost planning scenario. While reviewing rolled up costs, the extended costs of purchase components are not included in a rolled-up scenario.
Identify the reason.

 
 
 
 

Q56. A production operator needs to review the materials issued, resources charged, and operations performed for a job that was executed inthe previous shift.
Identify the task the operator has to select to review all the transactions in a single place for both Work Order and Orderless execution.

 
 
 
 

Download Free Latest Exam 1z0-1075-22 Certified Sample Questions: https://www.actualtests4sure.com/1z0-1075-22-test-questions.html

         

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below