Actual Test Materials
https://blog.actualtests4sure.com/2023/05/q11-q26-latest-ad0-e318-exam-with-accurate-adobe-campaign-classic-architect-master-pdf-questions-may-04-2023/
Export date: Fri Nov 15 20:34:14 2024 / +0000 GMT

[Q11-Q26] Latest AD0-E318 Exam with Accurate Adobe Campaign Classic Architect Master PDF Questions [May 04, 2023]




[May 04, 2023] Latest AD0-E318 Exam with Accurate Adobe Campaign Classic Architect Master PDF Questions

Practice To AD0-E318 - Actualtests4sure Remarkable Practice On your Adobe Campaign Classic Architect Master Exam

NEW QUESTION 11
A multi-national customer has Adobe Campaign users working in different geographic locations. They want to ensure that operations in each country can only work with recipients with physical addresses based in their region.
Which solution should be used?

 
 
 
 

NEW QUESTION 12
A customer needs help to optimize a workflow that automatically exports tracking records campaigns sent during the day.
The workflow has a scheduler that runs every 6 hours and reads tracking logs created current date minus 6 hours. During data validation, the customer notices that records are missing with this approach.
Which two recommendations should the Architect make? (Choose two.)

 
 
 
 
 

NEW QUESTION 13
A customer reports that data import, export and aggregation workflow take 3 to 4 hours each to complete, when they are scheduled to run before the campaign start. The is deploying the customer from starting campaigns on schedule.
Which two recommendations should the Architect make? (Choose two.)

 
 
 
 
 

NEW QUESTION 14
Refer to the exhibit.

A customer calls for urgent support. Their Adobe Campaign instance is running slowly and marketing workflows are taking a long time to execute the Architect finds.
* 50 workflow are running concurrently
* 24 workflows are stuck in pending state
* Workflows are scheduled to be executed at the same time every day
What should the Architect recommend?

 
 
 
 

NEW QUESTION 15
A retail company receives Adobe Analytics Insights about customer productcomplaints.
They want to execute a Windback campaign to these customers in within 1 hour of the customer’s web session.
What should the Architect recommend?

 
 
 
 

NEW QUESTION 16
A project Manager is setting up a Gantt chart for a new project implementation. The company Is using a Hybrid deployment model, will interact with several systems, and be heavily customized to fit the customer needs. The PMO not know the Adobe Campaign project phase and wants to make sure important tasks are not missed, The initiated list of Go-Live activities is as follow:
Migrate appropriate objects from Stage to Production
Make sure Production SFTP is created
Validate that import/export workflow work as expected
Make sure the Workflow Supervisor group is assigned to the appropriate workflows What else should the Architect do before the Go-live?

 
 
 
 

NEW QUESTION 17
A project Manager is setting up a Gantt chart for a new project implementation. The company Is using a Hybrid deployment model, will interact with several systems, and be heavily customized to fit the customer needs. The PMO not know the Adobe Campaign project phase and wants to make sure important tasks are not missed, The initiated list of Go-Live activities is as follow:
Migrate appropriate objects from Stage to Production
Make sure Production SFTP is created
Validate that import/export workflow work as expected
Make sure the Workflow Supervisor group is assigned to the appropriate workflows What else should the Architect do before the Go-live?

 
 
 
 

NEW QUESTION 18
A customer asks an Architect to build custom Adobe web Portal application for the Managing Campaign execution process.
The architect needs to make sure web application data is protected from SQL injection attacks and loaded into an external centralized data warehouse system.
Which approach should be used?

 
 
 
 

NEW QUESTION 19
A customer wants to minimize the total incremental cost of the campaigns. They are licensed for email, SMS, and postal mail channel. They have good data quality as well as significant historical data quality as well as significant historical data on contact rates per channel.

 
 
 
 
 

NEW QUESTION 20
A client wants to configure a data connection between a Microsoft Dynamics CRM system and Adobe Campaign Classic for delta data import.
Which field must be present in the CRM connection settings for the configuration?

 
 
 
 

NEW QUESTION 21
Refer to the exhibit.

A customer calls for urgent support. Their Adobe Campaign instance is running slowly and marketing workflows are taking a long time to execute the Architect finds.
50 workflow are running concurrently
24 workflows are stuck in pending state
Workflows are scheduled to be executed at the same time every day
What should the Architect recommend?

 
 
 
 

NEW QUESTION 22
A customer has the following requirements for a new Campaign implementation:
* 20 Marketing employees will access the Campaign instance from three different countries.
* Marketing employees will use MacOs and Windows 10 professional.
* 800,000 of the customers in the CRM system are emailed approximately twice a week.
* The customer uses a small mobile app for Push messaging that has 20,000 device registrations, which the customer hops to grow.
Which two factors have the most impact on the infrastructure solution? (Choose two.)

 
 
 
 
 

NEW QUESTION 23
A company has a campaign workflow that has 20 different segment defined in a Cell activity. Once the workflow reaches Delivery activity, the requirement is to provide counts that contain the following:
– Initial Query Population
– Count of records in each segment of the Cell activity
– Final Population targets in the Delivery

Which solution should the Architect recommend?

 
 
 
 

NEW QUESTION 24
A client captures interests in flat data files from external websites. The want to integrate the topic subtraction data into Adobe Campaign.

 
 
 
 

NEW QUESTION 25
A customer reports that data import, export and aggregation workflow take 3 to 4 hours each to complete, when they are scheduled to run before the campaign start. The is deploying the customer from starting campaigns on schedule.
Which two recommendations should the Architect make? (Choose two.)

 
 
 
 
 

NEW QUESTION 26
A client wants to configure a data connection between a Microsoft Dynamics CRM system and Adobe Campaign Classic for delta data import.
Which field must be present in the CRM connection settings for the configuration?

 
 
 
 


Adobe AD0-E318 Exam Syllabus Topics:

TopicDetails
Topic 1
  • Determine the correct method for solution promotion to the respective environment
  • Given a scenario, provide performance, infrastructure, and configuration recommendations
Topic 2
  • Specify the Data Model and integration map design parameters for a Campaign solution with other customer tools
  • Analyze and design custom integrations
Topic 3
  • Given specific business requirements, determine the information relevant to solution design
  • Determine the correct method to design solutions using additional modules
Topic 4
  • Given a scenario, advise on the appropriate hardware infrastructure needed during solution design
  • Specify integration parameters and approach for Adobe and non-Adobe application integrations
Topic 5
  • Analyze the overall solution to determine technical risks, assumptions, issues and dependencies
  • Determine the solution design required to comply with laws and regulations
Topic 6
  • Given a set of key modules, validate the configuration of the module set-up
  • Analyze Campaign Classic set-ups to advise on improvements
Topic 7
  • Given a scenario, recommend integration solutions to enable native and third-party integrations with Adobe Campaign Classic
  • Analyze and design custom features

 

Exam Questions and Answers for AD0-E318 Study Guide Questions and Answers!: https://www.actualtests4sure.com/AD0-E318-test-questions.html 1

Links:
  1. https://www.actualtests4sure.com/AD0-E318-test-que stions.html
Post date: 2023-05-04 16:49:39
Post date GMT: 2023-05-04 16:49:39

Post modified date: 2023-05-04 16:49:39
Post modified date GMT: 2023-05-04 16:49:39

Export date: Fri Nov 15 20:34:14 2024 / +0000 GMT
This page was exported from Actual Test Materials [ http://blog.actualtests4sure.com ]