NACE-CIP1-001 certification exam is a globally recognized program that certifies individuals as coating inspectors. NACE-CIP1-001 exam is conducted by the National Association of Corrosion Engineers (NACE), which is the world's leading organization that aims to prevent corrosion and protect the environment. Coating Inspector Level 1 certification program is designed to assess the knowledge and skills of individuals in the field of coating inspection and provide them with the necessary credentials to advance their careers.

 

Q31. Polymerization is the process of:

 
 
 
 

Q32. You are asked to be the only coating inspector on a small bridge recoating job where existing coating contains lead. The owners’ representative has supplied you with the local code governing the removal and disposal of lead based coatings, however upon reading the document you having great deal of difficulty understanding the technical language.
As a NACE CIP Level 1 Inspector your preferred course of action is to:

 
 
 
 

Q33. When performing tests for oil and grease using an ultra-violet light, the NACE Inspector should be aware that:

 
 
 
 

Q34. Excessive working of the surface with a power grinder can be detrimental because excessive burnishing

 
 
 
 

Q35. Stripe coats are best applied by:

 
 
 
 

Q36. The main responsibilities of the inspector are to

 
 
 
 

Q37. The primary difference between Non-Convertible vs. Convertible coatings is:

 
 
 
 

Q38. Owners hire NACE Inspectors’ with the expectation that:

 
 
 
 

Q39. Safety Data Sheets must be carefully reviewed by:

 
 
 
 

Q40. Whenever dissimilar metals must join, the most common practice is to

 
 
 
 

Q41. You ate the NACE Inspector on a job where NACE No. 2/SSPC – SP 10 has been specified. You are finding the Contractor is leaving mill scale on the on surface and as a result you have been rejecting the blast. The Contractor is very upset and has told you that the standard permits up to 5% of the mill scale to remain and still be in be in compliance with the standard.
Your FIRST preferred course of action is to:

 
 
 
 

Q42. Inspection documentation is important because:

 
 
 
 

Q43. Checking is

 
 
 
 

Q44. To be of value the Inspector’s documentation must be:

 
 
 
 

Q45. What is used to determine compressed air cleanliness?

 
 
 
 

Q46. Common errors that may produce inaccurate readings when using a Dial-Type Magnetic Pull-Off Dry Filth Thickness (DFT) gauge include:
Select All That Apply

 
 
 
 


NACE-CIP1-001 exam is designed for individuals who are responsible for evaluating the quality of coatings applied to various surfaces, such as steel structures, pipelines, and tanks. NACE-CIP1-001 exam covers a wide range of topics, including surface preparation, coating application, coating inspection, and quality control. Individuals who pass NACE-CIP1-001 exam are considered to have the necessary knowledge and skills to perform as a coating inspector.

 

NACE-CIP1-001 dumps Exam Material with 100 Questions: https://www.actualtests4sure.com/NACE-CIP1-001-test-questions.html

Post date: 2024-05-15 13:00:56
Post date GMT: 2024-05-15 13:00:56
Post modified date: 2024-05-15 13:00:56
Post modified date GMT: 2024-05-15 13:00:56