This page was exported from Actual Test Materials [ http://blog.actualtests4sure.com ]
Export date: Wed Dec 25 18:45:25 2024 / +0000 GMT

Released BCS CTFL4 Updated Questions PDF [Q42-Q66]




Released BCS CTFL4 Updated Questions PDF

CTFL4 Dumps and Practice Test (150 Exam Questions)

Q42. Which of the following statements is true?

 
 
 
 

Q43. Which of the following statements about white-box test techniques is true?

 
 
 
 

Q44. A company runs a pilot project for evaluation of a test automation tool. Which of the following is NOT a valid object of this pilot project?

 
 
 
 

Q45. Which of the following statements is true?

 
 
 
 

Q46. Which one of the following statements correctly describes the term ‘debugging’?

 
 
 
 

Q47. The statement: “Test activities should start in the early stages of the lifecycle, adhering to the testing principle of early testing” is relevant to which of the recognized software development models?

 
 
 
 

Q48. During which main group of test activity are the following tasks performed?
* Checking test results and logs against specified coverage criteria.
* Assessing the level of component or system quality based on test results and logs.
* Determining whether more tests are needed.
Select the correct answer:

 
 
 
 

Q49. Which of the following statements about the value of maintaining traceability between the test basis and test work products is not true?

 
 
 
 

Q50. Determining the schedule for each testing activity and test milestones for a test project, using activity estimates, available resources, and other constraints is a typical task performed during

 
 
 
 

Q51. Match each objective to the correct test level
Objective:
A) Verifying whether the functional and non-functlonal behaviors of the system are as designed and specified.
B) Verifying whether the functional and non-functlonal behaviors of the interfaces are as designed.
C) Verifying whether the functional and non-functional behaviors of the components are as designed and specified.
D) Establishing confidence in the quality of the system as a whole.
Test Level:
1. Component testing.
2. Integration testing.
3. System testing.
4. Acceptance testing.

 
 
 

Q52. Which of the following types of tools is BEST suited for determining source code compliance with the guidelines provided by a coding standard?

 
 
 
 

Q53. Which statement is true regarding confirmation testing and regression testing?

 
 
 
 
 

Q54. The following state transition diagram describes the functionality involved in a system using fingerprint and password authentication to log onto a system.

How many distinct states of the system are visible in the above diagram?

 
 
 
 

Q55. Which of the following statements about static testing and dynamic testing is true?

 
 
 
 

Q56. Given the following User Story: “As an online customer, I would like to be able to cancel the purchase of an individual item from a shopping list so that it only displays the relevant items, in less than 1 second”, which of the following can be considered as applicable acceptance test cases?
I . Click on my online shopping list, select the unwanted Item, delete the unwanted item, the unwanted Item is deleted from the shopping list in less than 1 second.
Ii . Click on my online shopping list, select all the items, delete all the items, the unwanted items are deleted from the shopping list in less than 1 second.
Iii . Tab to the online shopping list and press enter, select the unwanted item, delete the unwanted item, the unwanted item is deleted from the shopping list In less than 1 second.
Iv . Click on the checkout button, select the payment method, make payment, confirmation received of payment and shipping date.
V . Click on my shopping list, select the unwanted Item, delete the unwanted item, the unwanted item is deleted from the shopping list.
Select the correct answer:

 
 
 
 

Q57. A Test Manager conducts risk assessment for a project. One of the identified risks is: The sub-contractor may fail to meet his commitment”. If this risk materializes. it will lead to delay in completion of testing required for the current cycle.
Which of the following sentences correctly describes the risk?

 
 
 
 

Q58. A typical objective of testing is to ensure that:

 
 
 
 

Q59. A calculator software is used to calculate the result for 5+6.
The user noticed that the result given is 6.
This is an example of;

 
 
 
 

Q60. Which TWO of the following are benefits of continuous integration?
I . Allows earlier detection and easier root cause analysis of integration problems and conflicting changes.
II . Removes the need for manual test analysis, design and execution.
Hi. Removes the dependency on automated regression packs when integrating larger systems, or components.
iv . Gives the development team regular feedback on whether the code is working.
Select the correct answer:

 
 
 
 

Q61. A document descnbes the test procedures that have been derived for the identified test sets Among other things, the order in which the test cases in the corresponding test set are to be executed according to the dependencies described by preconditions and postconditions is specified This document is a typical work product produced as part of:

 
 
 
 

Q62. The acceptance criteria associated with a user story:

 
 
 
 

Q63. Which of the following statements about estimation of the test effort is WRONG?

 
 
 
 

Q64. Which of the following coverage criteria results in the highest coverage for state transition based test cases?

 
 
 
 

Q65. Atypical generic skill required for the role of tester is the ability to

 
 
 
 

Q66. Which of the following best describes the way in which statement coverage is measured?

 
 
 
 

CTFL4 Exam Dumps Pass with Updated 2024 Certified Exam Questions: https://www.actualtests4sure.com/CTFL4-test-questions.html

Post date: 2024-12-09 13:28:40
Post date GMT: 2024-12-09 13:28:40
Post modified date: 2024-12-09 13:28:40
Post modified date GMT: 2024-12-09 13:28:40