Rate this post

Prepare Top International Code Council M2 Exam Study Guide Practice Questions Edition

Go to M2 Questions – Try M2 dumps pdf

International Code Council M2 Exam Syllabus Topics:

Section Weight Objectives
Combustion Air 8% – Combustion air requirements
– Air supply and venting
– Confined spaces and equipment rooms
Exhaust & Ventilation Systems 20% – Makeup air systems
– Ventilation rates and outdoor air requirements
– Hazardous and special exhaust systems
– Commercial kitchen exhaust systems
Duct Systems 12% – Insulation and sealing
– Duct construction and materials
– Dampers and access doors
– Duct installation and supports
General Administration 18% – Permits and inspections
– Code authority and enforcement
– Manufacturer’s instructions and listings
– Plan review and documentation
Fuel Supply Systems 10% – Piping testing and inspection
– Gas appliances and connections
– Pressure regulation and overpressure protection
– Fuel gas piping materials and installation
Heating, Cooling & Water Heaters 18% – HVAC equipment installation and clearance
– Water heaters and storage tanks
– Boilers and hydronic systems
– Heat pumps and cooling equipment
– Solar thermal systems
Chimneys & Vents 14% – Chimney construction and materials
– Clearances and termination requirements
– Vent systems and connections
– Factory-built chimneys and vents

 

NEW QUESTION 18
When a permit is issued, the code requires that one set of approved plans and specifications be returned to the applicant.
This set of plans and specifications shall be:

 
 
 
 

NEW QUESTION 19
The exhibit shows a _____ in. diameter gas line between unit heaters 5 and 8.

 
 
 
 

NEW QUESTION 20
An 8-inch Type B venting system with a listed vent cap must terminate a minimum of _____ feet above the flat roof through which it passes.

 
 
 
 

NEW QUESTION 21
For gas piping installations, which of the following is an acceptable joining method for polyethylene (PE) pipe?

 
 
 
 

NEW QUESTION 22
The minimum rise required for a 10-foot run of vent connector is _____ inches.

 
 
 
 

NEW QUESTION 23
Infrared radiant heaters shall be installed:

 
 
 
 

NEW QUESTION 24
Supports for hazardous exhaust duct shall be constructed of:

 
 
 
 

NEW QUESTION 25
Exhaust is required for which of the following areas?

 
 
 
 

NEW QUESTION 26
A low-pressure steam heating boiler is a boiler furnishing a maximum steam pressure of _____ psi.

 
 
 
 

NEW QUESTION 27
All exposed gas piping shall be kept above grade a minimum of _____ inches.

 
 
 
 

NEW QUESTION 28
Floor furnaces shall not be closer than _____ inches to the ground.

 
 
 
 

NEW QUESTION 29
For the installation of listed fuel-burning appliances, the required clearances should be found:

 
 
 
 

NEW QUESTION 30
A cooling system with a condensate disposal system:

 
 
 
 

NEW QUESTION 31
The minimum size for access openings for fire dampers shall be:

 
 
 
 

NEW QUESTION 32
Supports for hazardous exhaust duct shall be constructed of:

 
 
 
 

NEW QUESTION 33
Ducts shall not be permitted to be connected to:

 
 
 
 

NEW QUESTION 34
Given: The listed clearance is 12 inches.

What would be the reduced clearance to combustibles, in inches, if the millboard is replaced with 24-gauge sheet metal?

 
 
 
 

NEW QUESTION 35
ERV systems shall not be installed in which of the following except:

 
 
 
 

NEW QUESTION 36
Where located on a roof with a 5:12 slope, a level platform shall be provided along the access panel of the furnace at least _____ inches wide.

 
 
 
 

Free Commercial Inspector M2 Exam Question: https://www.actualtests4sure.com/M2-test-questions.html

         

Related Links: myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt myportal.utt.edu.tt

By admin

Leave a Reply

Your email address will not be published. Required fields are marked *

Enter the text from the image below